Incinerator Model TS100

Average loading capacity of 1,000 kg/day with maximum loading capacity of 1,200 kg. Nominal burning rate shall be 100 -140 kg/hr with 8 hour daily operating cycle of ash removal, pre-heat and burn with continuous loading.Primary power source shall be electricity but capable of using diesel fuel as a supplemental fuel.The waste incinerators shall be designed for 3 Phase, 380-400 V, 50 Hz electricity supply.Should have dual combustion chambers with gas temperature achieve 1000 C for retention time at least 2 second,Have a thermal efficiency of not less than 85%.All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion.The incinerator combustion chambers should be designed for easy maintenance of all internal parts including the refractory and insulation. Materials used in the individual parts of the incinerator shall be heat resistance and also be protected against oxidation, corrosion, etc.Primary and secondary chambers preferably have rounded inside corners to avoid the formation of dead zone or cold pockets. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201   Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com  

Incinerator Model TS100

Average loading capacity of 1,000 kg/day with maximum loading capacity of 1,200 kg. Nominal burning rate shall be 100 -140 kg/hr with 8 hour daily operating cycle of ash removal, pre-heat and burn with continuous loading.Primary power source shall be electricity but capable of using diesel fuel as a supplemental fuel.The waste incinerators shall be designed for 3 Phase, 380-400 V, 50 Hz electricity supply.Should have dual combustion chambers with gas temperature achieve 1000 C for retention time at least 2 second,Have a thermal efficiency of not less than 85%.All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion.The incinerator combustion chambers should be designed for easy maintenance of all internal parts including the refractory and insulation. Materials used in the individual parts of the incinerator shall be heat resistance and also be protected against oxidation, corrosion, etc.Primary and secondary chambers preferably have rounded inside corners to avoid the formation of dead zone or cold pockets. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201   Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com  

HICLOVER INCINERATORS

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone …

HICLOVER INCINERATORS

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone …

HICLOVER INCINERATORS

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone …

double chamber incinerators

2.) Size requirement for the incinerators is 750 — 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/ hour. 4) The primary chamber shouId have an operating temperature of 900 -1200 degree C.5) The incinerator should hate a high temperature secondary chamber and 2 second gasretention time at 850- 1150 degree C so that it is suitable for high risk materials. 6). The incinerator should have temperature monitoring and thermostat control for ease ofoperation and assurance of bum temperature to confirm correct operation. 7). The incinerator should be capable of burning any of the hazardous wastes listed in thesubsequent section. 8) The incinerator should be capable of burning diesel oil and should include a larger fueltank (10-500 litres) and generator (3 –40 kV) set that can be carried on the trailer with theincinerator so that the unit requires no external electrical power supply. 9.) The incinerator should be trailer mounted so that it is a po 21. The de- ashing must be done in the bottom of the combustion chamber …

double chamber incinerators

2.) Size requirement for the incinerators is 750 — 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/ hour. 4) The primary chamber shouId have an operating temperature of 900 -1200 degree C.5) The incinerator should hate a high temperature secondary chamber and 2 second gasretention time at 850- 1150 degree C so that it is suitable for high risk materials. 6). The incinerator should have temperature monitoring and thermostat control for ease ofoperation and assurance of bum temperature to confirm correct operation. 7). The incinerator should be capable of burning any of the hazardous wastes listed in thesubsequent section. 8) The incinerator should be capable of burning diesel oil and should include a larger fueltank (10-500 litres) and generator (3 –40 kV) set that can be carried on the trailer with theincinerator so that the unit requires no external electrical power supply. 9.) The incinerator should be trailer mounted so that it is a po 21. The de- ashing must be done in the bottom of the combustion chamber …

double chamber incinerators

2.) Size requirement for the incinerators is 750 — 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/ hour. 4) The primary chamber shouId have an operating temperature of 900 -1200 degree C.5) The incinerator should hate a high temperature secondary chamber and 2 second gasretention time at 850- 1150 degree C so that it is suitable for high risk materials. 6). The incinerator should have temperature monitoring and thermostat control for ease ofoperation and assurance of bum temperature to confirm correct operation. 7). The incinerator should be capable of burning any of the hazardous wastes listed in thesubsequent section. 8) The incinerator should be capable of burning diesel oil and should include a larger fueltank (10-500 litres) and generator (3 –40 kV) set that can be carried on the trailer with theincinerator so that the unit requires no external electrical power supply. 9.) The incinerator should be trailer mounted so that it is a po 21. The de- ashing must be done in the bottom of the combustion chamber …